Resources
Approved public information, in one place.
Programme summaries organised by audience — every document shows its version, date, audience and approval status.
Browse by topicRider
A1 vs A2 at a glance
A one-page comparison of the two rider routes. A1 (Fleet & Centre Rental) is access: hire ≈ ₦5,500 per earning day plus battery service, with no vehicle loan and no large down payment. A2 (Rider Ownership) is ownership of the battery-excluded vehicle — the rider contributes equity and finances through a partner bank, and buys charged-battery service at ₦4,000 per Full-Equivalent Swap (≈ ₦5,200/day at 1.3 swaps/day). The centre owns the battery pool in every route.
Operator
Standard hub illustration
A summary of the standard swap-centre illustration for one hub: gross swap receipts, energy cost, the battery renewal reserve (₦657.11 per Full-Equivalent Swap) and the balance before debt service — all labelled as working assumptions from the approved programme model, not offers. The partner bank is the lender and credit decision-maker.
Finance
Equipment-import finance overview
An overview of how equipment-import finance is structured in the programme: the partner bank is the lender and credit decision-maker; 45–50% buyer equity and the 28% nominal reducing-balance rate over 36 months are the normalised illustration references; and proposed bank arrangements remain subject to contract.
Technology
Equipment & technology status
A status summary of the integrated system — tricycle and drivetrain, battery pool, connected swap cabinet, source-energy metering and the platform. Every feature carries a status chip (Programme requirement / Supplier-confirmed / Acceptance-tested / Operational); most are programme requirements today, and confirmed capability is evidenced supplier by supplier.
Climate
Climate Impact & MRV summary
A summary of the programme's measurement approach: measurement is designed and instrumented in the programme framework, and Phase 1 measurement data is not yet collected. No carbon credits or grants are claimed, guaranteed or implied.
This library publishes approved public summaries only — internal business plans, bank decks and build specifications are never published here. Superseded documents are retained with an archive notice; the current version always appears below.