Resources

Approved public information, in one place.

Programme summaries organised by audience — every document shows its version, date, audience and approval status.

Browse by topic
R

Rider

A1 vs A2 at a glance

A one-page comparison of the two rider routes. A1 (Fleet & Centre Rental) is access: hire ≈ ₦5,500 per earning day plus battery service, with no vehicle loan and no large down payment. A2 (Rider Ownership) is ownership of the battery-excluded vehicle — the rider contributes equity and finances through a partner bank, and buys charged-battery service at ₦4,000 per Full-Equivalent Swap (≈ ₦5,200/day at 1.3 swaps/day). The centre owns the battery pool in every route.

v1.013 Sept 2026Rider Approved for public release
O

Operator

Standard hub illustration

A summary of the standard swap-centre illustration for one hub: gross swap receipts, energy cost, the battery renewal reserve (₦657.11 per Full-Equivalent Swap) and the balance before debt service — all labelled as working assumptions from the approved programme model, not offers. The partner bank is the lender and credit decision-maker.

v1.013 Sept 2026Centre operator Approved for public release
F

Finance

Equipment-import finance overview

An overview of how equipment-import finance is structured in the programme: the partner bank is the lender and credit decision-maker; 45–50% buyer equity and the 28% nominal reducing-balance rate over 36 months are the normalised illustration references; and proposed bank arrangements remain subject to contract.

v1.013 Sept 2026Institution Approved for public release
T

Technology

Equipment & technology status

A status summary of the integrated system — tricycle and drivetrain, battery pool, connected swap cabinet, source-energy metering and the platform. Every feature carries a status chip (Programme requirement / Supplier-confirmed / Acceptance-tested / Operational); most are programme requirements today, and confirmed capability is evidenced supplier by supplier.

v1.013 Sept 2026All audiences Approved for public release
C

Climate

Climate Impact & MRV summary

A summary of the programme's measurement approach: measurement is designed and instrumented in the programme framework, and Phase 1 measurement data is not yet collected. No carbon credits or grants are claimed, guaranteed or implied.

v1.013 Sept 2026All audiences Approved for public release

This library publishes approved public summaries only — internal business plans, bank decks and build specifications are never published here. Superseded documents are retained with an archive notice; the current version always appears below.